From March 7 to 11, the first training course of 2025 on full life cycle maintenance and management of power equipment for Vietnam Electricity's Northern Power Corporation (EVNNPC) was successfully held in Kunming city, Yunnan province. Organized by CSG Lancang-Mekong International Co., Ltd. and implemented by CSG Yunnan Power Grid Corporation, the training brought together 34 management and technical personnel from EVNNPC.
The course covered the entire power equipment lifecycle — from planning and design to manufacturing, installation, operation, maintenance, and decommissioning — through theoretical instruction, case analysis, practical demonstrations, and site visits.
This training marks a concrete step in implementing the long-term strategic cooperation memorandum between CSG and Vietnam Electricity, further integrating advanced equipment management concepts into the development of a regional interconnected power grid.